This post's title pretty much sums it up; I finished the landscaping along the end of the peninsula. I brushed the area with a coat of matte medium, applied a line of cinder ballast along the outside edge of the layout. The I added a base layer of green fine turf, then patches of yellow fine turf and "burnt grass" course turf. I wet it all with 70% alcohol and droppered on more matte medium, which cooperated by drying.

With the turf done, I went ahead and added a few more high-voltage transmission towers. Intitially I planned to terminate them at the substation behind Water Street Frieght Terminal. But I really do love the look of the towers; they fit rather well with the industrial theme of the area.

I also decided to rethink the the whole drainage ditch next to supierior paper. I've seen many stormwater catch basins (or "sumps" as we called them on Long Island) in my area and most of them just have a pipe the empties into it and a tall intake structure.

Vis-
 

So yeah, I think just the basin itself is sufficient. That poject is nearly done. I planted a few more sprigs of Woodland Scenic field grass and all that remains is a few more details and pouring the water.

No comments:

Post a Comment