Sunday, January 11, 2026
The Layout Gets a Glowup
Tuesday, March 15, 2022
More Structure Lighting
All but one of the town building are illuminated. Dang, these LEDs are night-into-day bright! The gas station roof is glowing despite the black paint. In addition to the building lights, I took a Model Power Y-Shaped street light and bent it to resemble a 1980s-style gas station light.
As for what's going on across the street from the gas station, that's going to be a used car lot. The office is an old Nucomp Miniatures trailer. I'll elaborate on this scene more when it's finished.
Next thing on my list is finishing a partially-completed Model Power house kit. That will do it for the structures on this layout.
Thursday, March 10, 2022
Wired Up Some Buildings
You ever have one of those days where it seems like all you do is spin your wheels and get nothing accomplished? Yup, that was me today. I came up to the train room all fired up to get going on the wiring project. Well hit the first roadblock when my drill battery died almost instantly. That delayed my plans.
Unable to drill holes, I took a whack at wiring up the turn table. I had pre-drilled the holes years ago, so routing the wires was no problem. And the turntable didn't work. Stymied, I came back later.
This evening, armed with a fully-charged battery, I drilled holes and snaked the wires through the table top, one of my least favorite tasks. I managed to get everything hooked up to a barrier strip and - nothing. I tired switching the polarity, no change. With nothing else to try I switched the polarity again, and tightened down the screws, this worked.
One building is sitting on a wooden base so I glued it down. In very fitting end to this day, it warped! So yeah, today was a bit of a battle, but Altoona is one step closer to the finish line.
Thursday, July 9, 2020
Lighting and Assorted Miscellania
Wednesday, April 17, 2019
More Streetlights for Johnstown
Now that we're most certainly in the postseason here, I went and knocked a huge item off my to-do list. I installed about 18 street lamps I bought from a Chinese seller last month.
The festivities started with running a new low-voltage circuit to Johnstown. From there, it was drill, thread, glue, and solder until the lights were in. Since the lights aren't ornate, I kept them to the industrial areas. Despite their size, I think they turned out alright.
Friday, April 12, 2019
Fixed the blasted Corssever!
So, the first catastrophe, I noticed my T1 wasn't responding to the throttle. So, I placed it on the programming track and readdressed it. Unfortunately I forgot to flip the DPDT switch from the layout to the programming track! I suddenly found myself faced with the task of reprogramming every locomotive on the layout! This took me the better part of an evening.
With the decoder issue licked, I tried running trains. The trains on the inside loop stalling on the Peco double crossovers at the entrance to Johnstown. After futsing with the point rails (the usual culprit with Peco turnouts) and getting nowhere, I dug out the multimeter. I found the outside rail was dead as Dillinger. This was baffling since one of the two rail joiners was connected to a feeder wire.
I tried soldering the joint on the end opposite the feeder, something I'm always loath to do on a turnout. That didn't work. I soldered a feeder to said joiner. That didn't work either. So I decided to move the feeder to the turnout itself. So I drilled another hole through the layout, unsoldered the feeder wire and went to feed it through the new hole. It wouldn't go through. That's usually the case, so I grabbed a small dowel and pushed it through and "crack!"
I got out from under the table to see the crossover and part of the inside loop lifted into the air. I just can't seem to catch a break. Long story short, I got the wire fed and solder, the track repaired and the ballast touched up. Thankfully, after all, that the trains are running fine again.
Tuesday, March 5, 2019
Done with the Crossing Signal
These NJ International signals were installed on my previous layout. I tried putting them in this time last year. But I ran into a problem with the resistors. They simply would not stay sodered to the wires! After some frustration, I threw them in a drawer and forgot about them until today.
I dug the signals out, fired up my soldering iron and managed to get the resistors soldered back on. After a bench test, I set about installing them. Needless to say, on the first attempt at running the wires through the layout, a resistor came off. A bit annoyed, I calmly brought it back to the work bench and soldered it back on. Then I reinforced it with masking tape. It went in fine.
The trouble started when I tried installing signal number two. I tried running the wire and resistor came off. Okay, now I was getting pissed. I pulled the signal out and went under the table to retrieve the wires still stuck in the hole. I grabbed them and yanked. Then I realized I'd yanked the wrong wires. That was it; I blew a 50-amp fuse. I yanked the signal out of the layout, which I had just yanked common wire out of, and threw it across the room. I know, a very childish thing to do.
So yeah, total cluster @#$%. But the sort of good news is, the common wire appears to be soldered to the signal itself, so it may very well be fixable. Maybe someday I'll be feeling sufficiently masochistic to try again.
Tuesday, February 19, 2019
Aircraft Warning Lights for Superior Paper
My bright idea was to run fiber optics through the stacks and under the layout, where the blinking LED would be located. I started out with running the fiber optics through the stacks and CA'd them on each end of the stack. Them it was simply a matter of drilling through the table and connecting the fiber to the LED. That was no easy task, but I got at least one stack blinking.
The effect is pretty subtle but I think it works and the fiber is nearly invisible when the room lights are on. Now back to that drainage ditch...
Tuesday, March 20, 2018
And that's a wrap for this season!
Well folks, after a short but busy construction season, it's that time of the year again. The weather is warming up, yard work is coming into the picture and I'm ready to shift over towards running some trains. It's the same thing every march. But this year is different. Most seasons end with me stuck on some major task that can't be put off any longer and I don;t have the energy left to take them on. This year, I managed to knock out those two last projects.
First and foremost, I plastered up the remaining roads and sidewalks in Johnstown. It took me the better part of two afternoons but I got it done. Once that was done, I went ahead and drilled the holes for the lights.I finished things off by getting all the plaster work painted.
emboldened by my success, I decided to go ahead and get all the lights installed and wired up. I started off with a pair of Busch operating traffic lights. Then I installed some incandescent street lights along the main streets in the Johnstown business district. The buildings are lit with a mish mash of LEDs and incandescent salvaged from my last layout, whatever was on hand.
For the industrial areas, I used LEDs except for Water Street Freight Terminal. I used a pair of Model Power highway lights for Superior Paper and a pair of Goosneck Lamps for the freight station.
Now, I had planned to use a pair of NJ International crossing flashers. I did start the process of stalling them. But wen I tried to untangle the rat's nest left over from the last layout, things got ugly. The resistors on each signal decided to come unsoldered. After a bit of fighting, I gave up and tossed the lights and PC boards into a box for next year, if I'm desperate.
The last thing I did was apply some turf to a few spots and then spent a few hours cleaning track and trouble shooting. The K4 and M1 needed only a few spots cleaned. But on my first attempt at running the centipedes, they went stumbling and stuttering down the track like a misfiring car! The I1 wasn't too happy either and there was a lot of work with the bright boy and alcohol and rag.
So that's it for this season. I'm sure I'll get the itch to tackle the odd project or two here and there, but the heavy lifting is done for a while. Before we know it, it'll be fall and I'll have the itch again. Until then, have a nice summer everybody!
Saturday, February 3, 2018
The Johnstown Industrial Track is Operational
Another productive afternoon on the railroad. I guess the title kid of sums up what I did. I had to wire up a feeder to get the out main operational again. So I figured since I was already in wiring mode, I might as well put on my big boy pants and get it all done. Long-time readers of this blog already know how I feel about wiring so, 'nuff said.
NW2 Number 5519 had the honors of being the first locomotive to move under her own power on the line. There were a few hiccups, but I was able to run the length of the track and pickup and spot cars on the sidings. So yay, nice to have that millstone from around my neck
While I was at it, I also laid the track for the Pittsburgh Staging lead and installed the foam mountain in the corner of the layout. Now all that remains to be done is finish plastering the road, plaster the remaining mountains, paint the ground and roads and apply the turf. All? That's a lot actually. Oh and I forgot building and street lights and ballasting track. I better get busy!
Wednesday, December 13, 2017
Illumination!
I took on yet another project I've been dreading, lighting the buildings in the along the wall section from Cassandra to Johnstown. Longtime readers of this blog know of my distaste for wiring, so you'll understand the foot dragging.
In terms of procedure, there's nothing special to report here, just drill the hole, feed the wires and hook them up. All the lighting is LED.
In other news, I've ordered a bunch of flex track and turnouts for Johnstown, so I'll hopefully get going on that by the end of the week. I realized I had room for one more big industry, so I decided to include a kit I'e always wanted but never had room for, Cornerstone's "Superior Paper."
Monday, January 16, 2017
Finished wiring the industrial sidings
![]() | |
| The first locomotive to enter the feed mill siding under its own power. |
![]() |
| And spotting a car on the Vulcan spur. |
![]() |
| Headed back to the main line. |
I followed my gut, grabbed my bright boy and gave the siding and both turnouts a good cleaning. On the siding, the loco ran nice an smoothly, but instantly came to a stop on the turnout again. Long story short, after spending several hours farting around with cleaning the turnouts and even adding another feeder between them, the locomotive simply would not run through them.
Now the turnouts in question are Peco electrofrogs. Unlike the old Atlas Code 80 switched, which used a plastic frog, the switches have powered frogs and the polarity changes based on which way the turnout is thrown. To accomplish this, the movable point rails conducted power from the tow outside rails. This is dependant on them making good contact and in fact neither of these turnouts were. At any rate, the lightbulb finally went on and what I ended up doing was slightly bending the end of the point rails outward ever so slightly. This forced them into contact with the outer rails and solved the problem.
With this project out of the way, I've conquered one major barrier to operating. Now it's time to seriously think about the operating scheme.
Tuesday, August 30, 2016
Lighting up Gallitzin
Tuesday, March 15, 2016
As you can see, I've gotten some more lights installed and wired up. Now one problem I've noticed with these LEDs is they are turn-night-into-day bright. As such even these houses painted dark colors tend to glow. Normally, the solution to this problem is painting the insides of the walls black. This worked on three out of four houses. However, my Model Power farm house is glued to a plastic with only a mall hole to allow a lightbulb. As such paining the inside is next to impossible. A solution has yet to present itself.
And hows about the streetlights? Aren't they, um, great? I ordered them from China via eBay and they looked good in the pic. Unfortunately, these things are freaking huge! Like HO scale huge. Well, since I don't have time to track down a replacement they'll have to do. It kind of take me back to my O-Gauge Hi Rail days.
Saturday, March 5, 2016
Let There Be Light!
As you can probably tell by the title of this post and the above photos, I've been installing lighting on the layout. On my last layout, I waited a bit to do this step, but since I made parts of this layout really difficult, if not impossible to access once the scenery is completed, it was now or never. The lack of access also mandated the use of LEDs for lighting. Unlike incandescent bulbs, LEDs last a long time, probably the life the layout. As an added bonus, they use a fraction of the power.
With that in mind I added some LEDs to the industrial structures in Gallitzin. Then I ordered some industrial-looking street lights from China. I must say with the room lights turned down, they look awesome. If that weren't enough, I took some blinking red LEDs and added them to the roof of the cement plant to simulate aircraft warning lights.
| DC-DC Buck Converter steps the voltage from the power suppl down to the right level |
I've also been working on the residential part of Gallitzin, which is set into a hillside. My original plan was to make steps of of styrofoam, but thy ended up being too steep. After some head scratching I decided to use some cardboard sheets to create more gradual steps down. Once the lighting for the houses and street lights is done, I should be able to tie this area up rather quickly.
Monday, December 28, 2015
A Project So Nice I Did It Twice
Monday, December 21, 2015
Added a Programming Track
Wednesday, December 16, 2015
About time I posted on here
Now that the semester is over, I've manged to take on a few long-overdue projects. First among them was moving the track lights around to better illuminate parts of Horseshoe Curve and Altoona.
Another item I crossed off my to do list was installation of more Digitrax UP5 panels. I added an additional panel near the entrance to Johnstown yard and the other near the Gallitzin industries.












