Monday, October 24, 2016

2015-16 Layout Progress Report

Well folks, it's that time of year again when I recap what I've done over the past year. Boy it's been a productive year too! Let's start with the basics.

Track: 100% complete

Wiring: All main lines and yards wired up and operational. Only four Industrial sidings remain to be wired along with part of the Altoona shop.

DCC Conversion: System Installation 100% complete, Fleet Conversion: PRR: 99% complete, Conrail Fleet 0%, NS: 80%.

The goal for last year was to complete Gallitizn. I managed to do all that and more. In fact I've moved into Cassandra and am making good progress there. I've also completed the crossing of the Conemaugh River.

Another goal I set for last year was to start working on the operating scheme for the railroad. Well, I still haven't made any progress on that front. At some point I will need to install a signal system, an expense I'm not looking forward to.

So let's talk goals for next year. My main area of focus will be the area from Cassandra to Johnstown. This leaves only the urban areas of Johnstown and Altoona to finish up. Whatever else I get done this year is gravy. And you know what? I'm in no hurry to get it done. While it's nice to start seeing an actual model railroad emerge from the swath of pink styrofoam, after finishing Gallitzin, I kind of felt like Ahab at the end of Moby Dick.

That bare styrofoam is a non-renewable resource and for me model railroading is very much about the journey more than the destination. There's still plenty to do after the scenery work is finished, like the aforementioned signal system and then serious detailing.  But what will I do when the layout's done? There's that old cliche about a layout never being done. I imagine I'll focus operating for a while. Once my kids get older, I may well end up sharing more of the space up there with them. Until then however, all aboard!

Saturday, October 1, 2016

Bachmann Ten-Wheeler Restoration: New Headlight

This has absolutely nothing to do with the layout, but since I need more materials before I can move on, I thought I'd share it. As you all know, I once had a garden railway and as such have lots of G Scale equipment. One loco is this Bachmann 4-6-0 lettered for the South Pacific Coast Railroad. I received it for my tenth birthday and, being a 10-year-old boy, I played rough with it. I dug her out of storage and she wasn't a pretty sight. So I decided a full restoration was in order.

Tonight, I started that restoration by replacing the headlight. The original filament bulb burned out decades ago. Seriously, I hasn't worked since Hootie and The Blowfish "I only wanna be with you" was in the top 40! Anyway, instead of another fillament bulb I opted for an LED. Here's how it went down:

The LED is a bright white 3mm with presoldered resister. These can be scored off eBay usually from Chinese seller for dirt cheap prices.

  
The headlight bezel needs a larger hole to accomodate the LED. Bother wires and the resister can fit through the existing hole in the top of the smoke box.
The wires from the headlight lead to a small switch on the back of the smoke box front. I clipped these wires about an inch or so from the end and stripped them. Then, I used a pair of alligator clips to temporarily connect these wires to the leads from the LED. Since polarity is crucial with LEDs, I applied power to the locomotive and made sure the headlight illuminated while the locomotive was running forward. With correct polarity determined, I spliced the wires, soldered them and covered the joints with Kapton tape. I reassembled the locomotive and called it done.


The headlight is quite bright, perhaps maybe too bright. But still, it's nice to see it lit once more. What's more, despite sitting in storage for nine years and having the crappy white plastic gears Bachmann used in all it's mid-1990s models, she still ran. She will need her gears greased and moving parts oild before I really run her for any length of time, but I think I'm on the right track.

Friday, September 30, 2016

Thises and Thats


I've been piddling a away on a few little odds and ends as of late. First and foremost, I took my son up to Day Out with Thomas at the North Carolina Transportation Museum in Spencer last weekend. Anytime I go up to Spencer, I stop in at the Little Choo Choo shop. I spied the Conerstone Municipal Water Tower on the shelf and picked it up. The stock colors were spot on perfect so all I did was use some Woodland Scenics dry transfers to add "Gallitzin" to the side of the tank. Now, rather than apply the letter directly, I applied them to some clear decal paper and then put the lettering on just like a regular decal. I then added the "Welcomes You" decal that came with the tower, did some weathering and called it done.


Next on my list was this small farm scene located between  Gallitzin and Cassandra. The Farmhouse and Barn are American Model Builders structures. I built these years ago and honestly don't remember the colors I used. The windmill is a Conerstone Van Dyke Farms Windmill. The uprights are painted Floquil "Rust" and the blades are Testors white.

I also went ahead I put in a gravel driveway, turf and some details. All that remains for this area is trees, both background and foreground and ballast. 


The last thing I took care of is a project I've been dragging my feet on for a while and that's putting a new decoder into my L1 Mike. Originally I'd used a Digitrax DZ123. It did the job but cause the shell to sit too high. This looked really stupid. After living with it for a while, I pulled the decoder out and stuck it in my Model Power mogul. While in Spencer, I went ahead and picked up a DZ126T. This is the same practically microscopic decoder I used in my Minitrix B6. This decoder is a perfect fit. All that remains is to use some fiber optic to get the headlight working. 

The Digitrax DZ126T is a much better fit






Monday, September 12, 2016

Here Come the Trees!







This past week, I planted just a ton of foreground trees in Gallitzin. The effect was immediate.  The deciduous trees quickly transported the layout from high plains Colorado back to Pennsylvania. With the exception of a select few, the trees are all Woodland Scenics. Some were salvaged from my previous layout and some were even salvaged from my old PR&Y layout (link). 

Now, as you know, over by Horseshoe Curve, I chose to use trees made from goldenrod to save money. Well, I think the Woodland Scenics trees look a ton better, so I decided to just cough up the extra saw buck and go with them. Another downside of these trees is the require assembly, messy, tedious assembly. The prescribed meathod is to take the plastic armautres, bend them into the shape of a tree and slather them with Hobby Tack (yet another expensive Woodland Scenics product). Once that's done you dip the armature into the bag of "clump foliage," give it a hake and presto! You have a tree! Or so Woodland Scenics says anyway. More often than not, I pull the tree out of the bag and about 90% of the folliage falls right off.

Anyway, after assembling about three trees using the aforementioned method, I chucked the Hobby Tack and grabbed my can of Elmer's spray adhesive. This was the ticket!  I was able to crank out enough trees to finish Gallitzin in no time at all. Now, all that remains is staining some rocks, adding the power lines and some detailing.

Wednesday, September 7, 2016

Finished with the ballast and turf at Gallitzin



The title of this post really says it all, doesn't it? As you can see from the photos I also started planting some trees and added an underpass to the eastbound tracks. Said underpass was constructed using part of the base from a Model Power house kit, the girders from an Atlas code 80 through girder bridge, some Plastruct styrene and some Floquil "Grimy Black" paint. The abutments are from Chooch.

Now, all that remains is planting some trees, adding the remaining power lines and some detailing. Hopefully, Gallitzin should be done by week's end. With that, about half the layout will be seniced.

Friday, September 2, 2016

Earthworks Finished at Gallitzin




The terrain at Gallitzin is well and truly finished. Now all that remains is to do the roads and the plaster work is done. After that, I have to paint the terrain, turf it, plan some trees and ballast the eastbound tracks. When that's done, it's on to Cassandra!

Tuesday, August 30, 2016

Lighting up Gallitzin




Last night I sucked it up and wired up the remaining building lights in Gallitzin. All told, it wasn't that bad. I must say the results are quite impressive. Now, one problem I consistently find myself running into with these LEDs is they are so bright, the make the  buildings glow. The only real solution is to paint the inside black. 

Anyway, with that out of the way, Gallitzin is one major step closer to being done.