Sunday, February 4, 2018

Ballast, Turf and More






Another productive afternoon of chipping away at the Johnstown to do list. First and formost, I ballasted bout half of the industrial track. You already know of my misgivings with ballasting so I won't bore yo with them again. But I will say this, this ballasting experience was pretty painless as far as that particular task goes.

With the ballasting done, I went ahead and applied the turf around Superior Paper and the ice house. With the turf in place, the scene really started to come together. But there's still plenty to be done.
I think the next project will be to paint the gutters in between the yard tracks black. This will make accidental holes in the ballast much less noticeable. 

The last thing I did scenery wise was to add a pair of Tichy Train Group crossing signs at the grade crossing.
 
Another little project was to add about eight inches of track to the Water Street Freight Terminal siding. This came about because I was spotting boxcars and found my little NW2 didn't quite respond to the throttle quickly enough. My boxcars ended up on the ground. The extra bit of track gives an operator a bit more margin for error.

Saturday, February 3, 2018

Lot's and Lot's of Painting


Wow, two posts in one day! After my son woke up from his nap, I brought him up to the train room and I set about painting the roads and parking lots while he happily played with the O-Gauge layout and watched Paw Patrol. I found some Apple Barrel acrylic "Pavement" paint at Wal Mart and the color was perfect.

With the roads and parking lots done, I grabbed my jar of raw umber acrlic and started painting the foam base inside the yard tracks. I tell ya, it sure is fun seeing all that pink disapear and an actual model railroad start to emerge.

The next few projects on my radar screen are to finish the roads, install the NJ International crossing flashers, install the remaining lighting and get the rails painted. That should easily take me into March.

The Johnstown Industrial Track is Operational




Another productive afternoon on the railroad. I guess the title kid of sums up what I did. I had to wire up a feeder to get the out main operational again. So I figured since I was already in wiring mode, I might as well put on my big boy pants and get it all done. Long-time readers of this blog already know how I feel about wiring so, 'nuff said.

NW2 Number 5519 had the honors of being the first locomotive to move under her own power on the line. There were a few hiccups, but I was able to run the length of the track and pickup and spot cars on the sidings. So yay, nice to have that millstone from around my neck

While I was at it, I also laid the track for the Pittsburgh Staging lead and installed the foam mountain in the corner of the layout. Now all that remains to be done is finish plastering the road, plaster the remaining mountains, paint the ground and roads and apply the turf. All? That's a lot actually. Oh and I forgot building and street lights and ballasting track. I better get busy!

Friday, February 2, 2018

Making Tacks

Not a whole lot to report here. But, I laid the roadbed for the staging yard lead and cut a tunnel through the styrofoam. I stuck and Chooch Industries tunnel portal left over from my last layout at the tunnel mouth. The next step will be track.

Although the section of track is relatively short and straight, it's in a nearly inaccessible area of the layout. So naturally me enthusiasm for the project has been limited. But I have to get it done before I cane finish up a lot of other projects. So rahter than procrastinate and let the season slip away, I'm forcing myself to do it.


Speaking of tedious projects, I dug out my jar of "Rail Brown" and started painting the rails on the Johnstown Industrial Track.  This is another one of those jobs, like wiring, that I can only stand in small doses. It's kind of funny how my supposedly relaxing hobby has a lot of pain-in-the-ass jobs we dread.

Thursday, February 1, 2018

They Paved Paradise, Put Up a Parking Lot

 As you can see from the above photo, I went ahead and plasterized the parking lots for Superior Paper and the Bralick Building. Now, I am not a huge fan of paving wide areas like this because it's almost impossible to get everything level.

Rather than use Woodland Scenics' Paving Tape, I decided to use weather stripping of about the same thickness. This turned out to be a big mistake. I don't know if I got a bad batch or if it just sucks, but that stuff simply would not stick to foam base! The solution, or a least a solution, was driving small finish nails through the stuff to hold it in place.

With my enthusiasm already flagging, I started dolling out the patching plaster and smoothing it out. This part wasn't as bad as I thought it would be but wasn't without it's problems. As usual the surfaceis anthing but level and will require a lot of sanding and fine tuning to look right.
While I was at it, I sucked it up and installed the turnout for Pittsburgh Staging. Normally, this wouldn't be that bad but, it's in a really hard to access part of the layout. This also required adding a new feeder for the outside rail. I don't plan on wiring up the staging lead until the actual staging area actually built. I can't have any of my locomotives rolling off the end of the layout and bouncing down the stairs.

Tuesday, January 23, 2018

Train Room Safety

Alright, I'm about to sound like a nagging mother but, raise your hand if you've done any of the following: used spray paint or Dulcote inside without a respirator, cut Styrofoam with a hot knife or wire without adequate ventilation, used acetone to clean your hands after a messy painting project, used solder and flux in a confined space, used a Dremel without eye protection and the list goes on. My hand went up for all of them.

Where am I going with this? Well, last march (2017) I attended the wedding of a very dear friend from college. Two years prior this friend was diagnosed with Adenoid Cystic Carcinoma, a very rare, but treatable, cancer. Thankfully, my friend beat it and is now cancer free. However, without going into too much detail, there were lingering effects of the treatment, which as I write this, she is currently in surgery to help correct.

Seeing her at her wedding was a bit of a wake up all for me. For a while one of my guilty pleasures was taking my copy of Model Railroader out to the back porch and reading it while enjoying a cold beer and a cigar. I knew it wasn't the best thing for my health, but when I got home from the wedding, I opened my humidor and dumped all my cigars into the trash. I haven't smoked one since.

Then I started thinking about all the things I mentioned in the top paragraph, and how they weren't the smartest things to be doing. So I instituted a few new safety rules for the train room.

To whit:

1. All spray painting and Dulcote is done in the garage with the door open.

2. The same goes for cutting foam with hot knives and such.

3. If doing the above in the train room can't be helped, then I open the window and get a few fans blowing first.

4. I'm trying to limit my use solvent-based Floquil and Polyscale paints. Not only because of the fumes, but because as we all know, they're no longer made and when they're gone, they're gone.

5. Eye protection when using the Dremel.

6. I've also decided not to use dangerous tools when my wife isn't home. Somebody has to be able to call EMS you know.

So anyway, here's hoping my friend makes a speedy recovery.

Sunday, January 21, 2018

Johnstown Industrial Track is finished

I guess the picture really sums it up, doesn't it? I laid the last section of the Johnstown Industrial Track leading to Superior Paper. Nothing unusual to report here, squirt the glue, pin down the roadbed and repeat with the track. The glue of course cooperated by drying. Now I just have to get all this track wired up.

As you can see, I've started taping out where the roads and parking lots will go.With the exception of the ice house, which has a gravel parking lot, all the rest will be asphalt or concrete. The will be one road that starts at Superior Paper and wends its way past all the industries before crossing the main line near the wall. I have a pair of NJ International crossing flashers I plan on hooking up at the main line crossing.

In other news, the Central Railroad Model and Historical Association is holding their annual train show in Easley, SC on February 9 & 10. As to whether or not I'll go, that's still undecided. The past few years, the show has been a bit of a disappointment with only a handful of vendors with N Scale.  Mostly it's just tables and tables of insanely junky old postwar Lionel. What's more, the sellers of said Lionel stuff more often than not, refuse to budge on their prices, usually citing some kind of price guide.

But Easley has always sort of marked the final push for the season before winter turns to spring and life's distractions start popping up. So, maybe I will go, if for no other reason than to get out of the house. I've learned a long time ago that sometimes the best deal at a train show is leaving with your money in your pocket.