Tuesday, February 10, 2015
More Weathering
Got a couple more freight cars weathered and ready to go. Used the usual procedure so nothing special to report here. Still have a few more to go.
Saturday, February 7, 2015
Line Poles are In
I got the remaining line poles installed around Horseshoe Curve and up to the eastern portals of the Gallitzin Tunnels. The poles themselves are from Model Power and came with building kits. Before the poles got anywhere near my layout, they were painted roof brown and sprayed with Dulcote. I removed the big ugly base from each pole, then poked a hole in the scenery, inserted to pole and added a drop or two of Elmer's glue. The next step will be the actual lines.
Tuesday, February 3, 2015
Turf and Trees by the Tunnels
As you can see from the above photo, I've covered most of the new scenery with Woodland Scenics blended Turf. As usual, I started with a green blend, then added some yellow to break up the golf course look. I topped it off with some course turf to simulate underbrush.
Once I was done with the turf, I started planting goldenrod trees. I ran out of them in short order and need to do another batch.
Monday, February 2, 2015
Weathering Rolling Stock and Painting the Earthworks
I managed to get some of the freight cars I bought at the train show weathered yesterday. As usual I went with chalks. I think the cars tuned out rather nicely.
While I was at it, I went ahead and painted the recently-constructed mountains. Just painting all those white masses brown really makes a huge difference. I can't wait to get on with turf and trees.
After this all that remains is some more hillsides near Kittanning Point, pole lines and wire (yuck), roads and the lake in the middle of the curve. With that, all scenery between Altoona and the east portals of the tunnels will be done. From there, I hope to finish up Altoona proper and then move into Gallitzin.
Saturday, January 31, 2015
Finished the Mountains and Ballasting Between Altoona and the Gallitzin Tunnels And the Train Show Haul
Today was quite a productive day on the Pittsburgh Division. The mountains on both sides of the tracks are now constructed from Altoona all the way to the east portals of the tunnels. This required constructing the mountainside in front of the tracks. I started by gluing a trip of cardboard along the top of the risers to give the edge of the paper towels something to rest on. Then I wadded up some newspaper and stared laying the plaster-soaked paper towels over them.
Now, usually when I build the mountains in front of the tracks, I simply have them slope down and away from the right-of-way. However, as you can see in the above photo, I built I small ridge on front of the curve. This ridge happens to be on the opposite side of Horseshoe Curve from Kittanning Point station. It acts as a view block, at least for the camera anyway, and helps give the illusion of distance.
I also ballasted the remaining track between the curve and the tunnels. As usual this job was about as much fun as getting audited. It wasn't the complete cluster *&^% that I had last time but still not pleasant. I have come to learn that it spreads better with a soft brush rather than a stiff one. Although, after ballasting a stiff one always does seem like great idea if you catch my drift.
In other news, I attended the Central Railroad Model and Historical Association's annual train show. Unfortunately there was very little in the way of N Scale but there were a few good buys. Namely these Life Like PAs:
And this Bachmann Crane and Boom, which unforuntaly will not clear the tunnel portals right now.
| Bachmann Crane and Boom car, perfect for retrieving the smoldering wreckage of derailed trains. |
Friday, January 30, 2015
More Progress at the Tunnels
Scenery is nearly complete to the eastern portals of the Gallitzin and Portage Tunnels. The background trees are in place and the tunnel portals have both been installed.
The next major project will be plaster work in front of the tracks and the ballast. After that, I'll get the foreground painted, line poles installed and foreground trees.
In other news, I'll be headed to the annual Central Railway Modle & Historicl Association train show (link) in Easley this weekend. The amount of N Scale there in recent years hasn't been much to speak of, but it's still nice to go. I'll mostly be looking for rolling stock and/or structure kits and possibly scenery materials.
Sunday, January 25, 2015
Model Railrading on the Cheap
A topic
that seems to pop up on model railroading forums with rather annoying frequency
is the high cost of the hobby. Yes, model railroading is expensive, what with
locomotives costing hundreds of dollars and freight cars averaging about $15
each well, you get the idea. But what hobby isn’t expensive? Have you seen the
price of a set of golf clubs? Or fishing equipment? Or tried restoring a
classic car? Hobbies cost money, but there are ways to be frugal and do things
cheaply. I’ll share some of my cost cutting strategies.
Knowing which corners
to cut:
In model railroading, a lot
things are expensive but have cheaper alternatives. However, while sometimes
the cheaper alternative is the way to go, other times you get what you pay for.
Electronics, train control, motive power, track (especially turnouts) fall into
the latter category. This is where you want to buy the best because it will
give you many years of good service.
Save on Scenery:
Scenery
materials on the other hand present a great opportunity to save big bucks.
Hydrocal Plaster and Woodland Scenics “Smooth It,” are both costly. However,
inexpensive plaster of Paris works just as well. You can use it for rock
castings and plaster roads. Bear in mind, it is heavier than Hydrocal and that
is a consideration.
Plaster
cloth is another corner you can cut. At about $9/roll this stuff can eat up a
budget quickly. Mountains can be built
equally well by mixing up a viscous batch of plaster of Paris and dipping paper
towels into it. This is a pretty old-school method of scenery construction. But
you know what? A bucket of plaster mix and a roll of paper towels goes much
further than a roll of plaster cloth.
| These mountains were built using plaster of Paris-soaked paper towels, a cheaper alternative to plaster cloth. |
Plaster
and paper towel scenery is one of those get-what-you-pay-for deals. I bought
some really cheap paper towels at the dollar store and they simply fell apart
when I tried to build mountains with them. So buy good paper towels; you’ll
still come out ahead.
Buy things when they’re
on sale:
I use a lot of lichen for my
background trees. I prefer the natural look of the material. You can buy this
from your hobby shop for about $10 per bag. But why? You can get it for $7 a
bag at Michaels. But you can get it even cheaper than that. Every week Michaels
offer coupons, usually either 20% off your entire purchase or 40% off any one
item. Either way, that’s a nice little discount.
| The lichen in these pics was purchased at my local Michaels with coupons printed from their web site. |
Use of
these coupons is not limited to lichen. Michaels carries just a ton of stuff
that you can use on a model railroad. They carry model paint, Dulcote, paint
brushes, plaster of Paris, acrylic paints and anything else you can think to
repurpose for model railroad use.
The best things in
life are free:
Free is
a hard price to beat. Many natural materials for making scenery can be obtained
for free. For example I make extensive use of goldenrod to make foreground
trees. It grows everywhere around here. All I do is go to a vacant lot, with permission of course, and
help myself. The only thing I have to pay for is the paint.
| The trees in the foregroub were made from goldenrod harvested from a vacant lot and spraypainted. |
If you
live in a subdivision that’s still under construction, odds are there’s a few
houses being built. The construction generates tons of scrap wood that would
just be thrown out. Now, I can’t stress this enough, you must, I repeat MUST obtain permission to take any scrap
materials. Now, odds are they
building will be happy to let you take anything that’s going to be thrown out
because more often than not, they must pay to dispose of it properly.
Once you
have obtained permission both to
enter the site and take scrap, take only what you know is trash. Entering without permission is trespassing
and taking anything else is steeling.
Anyway, now that I’ve beaten you over the head with that point, you can find a
lot of useful material in the scrap pile. Bits of old plywood make great
shelves or control panels. Scrap pieces of lumber might save you a trip to Home
Depot. You never know.
Anyway,
I hope these tips help you save a few bucks and further your enjoyment of the
hobby.
Subscribe to:
Posts (Atom)